Now accepting priority registrations for Suppliers and Clients. All product inquiries are currently being processed through our central Trade Desk.   ◆   Now accepting priority registrations for Suppliers and Clients. All product inquiries are currently being processed through our central Trade Desk.   ◆  
← All articles

November 11, 2026

Temporary Floor Protection: How Commercial Contractors Should Specify It

Temporary Floor Protection: How Commercial Contractors Should Specify It

Commercial interior with finished flooring covered by temporary surface protection, AEROGUARD™ wordmark with Armor Underfoot tagline

Quick answer: Specify floor protection by the finished surface, expected site traffic, exposure to spills, installation labour and required time in place, not by material name alone. For a commercial project, confirm compatibility with the flooring manufacturer, define the protection and removal requirements, and calculate coverage with an allowance for cuts and overlap.

Why floor protection fails on commercial sites

Protection can fail when it is chosen without considering what is happening underneath and on top of it. A covering that shifts, wrinkles or has poorly managed edges can create trip hazards and expose the floor. A product that traps moisture may also be unsuitable over a newly installed or curing surface.

Before specifying temporary floor protection, confirm:

  • Surface and cure status: Identify the flooring type and confirm when it can safely be covered.
  • Work and traffic: Account for foot traffic, carts, tools, paint, dust and likely spills.
  • Attachment method: State where tape is permitted. Do not assume tape is safe directly on the finished floor.
  • Duration and inspection: Set an intended removal date and require checks for movement, moisture and damage.
  • Removal and reuse: Specify how the material will be lifted and whether reuse is allowed by its manufacturer.

Follow the flooring manufacturer’s care and installation guidance first. For example, Mohawk’s engineered-flooring instructions address protection and attachment considerations for its products.

Different temporary floor protection materials arranged for comparison on a commercial floor

Compare the main floor protection systems

These are general trade-offs, not substitutes for product instructions or flooring-manufacturer approval.

System Taping requirements Liquid barrier Impact cushioning Clean release Site risk
AEROGUARD™ self-adhesive fleece Self-adhesive; zero perimeter taping required Waterproof PE top layer Fleece layer provides some cushioning under foot traffic 90-day residue-free clean release Anti-slip fleece limits movement; transitions still need attention
Heavy paper board Seams and perimeter usually need tape Varies by product; not rated as a full waterproof barrier More substantial underfoot; better suited to incidental impacts than paper Not residue-rated; reuse depends on condition after exposure Edges can lift if not secured; tape applied to the finished floor is a risk
Rosin paper Overlaps and seams usually taped None; unsuited to wet work Minimal; a light-duty, dry-work covering Generally disposable; damp paper can transfer to the floor Shifts or wrinkles; moisture staining risk
Poly film Seams and edges need management; adhesive-backed films reduce some taping Good barrier against dust and liquid, depending on the material Minimal; thin film offers little cushioning Adhesive films require surface and residue testing before broad use Bunches underfoot; can trap moisture over curing surfaces

For further comparison, see the manufacturers’ product information for Ram Board and Easydek Multi Cover Air Plus. These products have their own specifications and should not be treated as equivalent to one another, or to AEROGUARD™.

When self-adhesive fleece suits the specification

AEROGUARD™ Commercial Surface Protection is a specification-grade floor protection fleece for commercial projects where fast, controlled installation matters. Its stated features are an anti-slip fleece with a waterproof PE top layer, zero perimeter taping required, and a 90-day residue-free clean release.

The zero-perimeter-taping requirement can reduce installation steps compared with systems that need perimeter tape. The waterproof top layer and anti-slip fleece are key product specifications; they do not remove the need to prepare the surface, check compatibility or inspect protection during the job. Confirm the intended installation with the project team and flooring manufacturer, especially on newly installed or sensitive finishes.

AEROGUARD™ is supplied in a 1 m × 30 m roll, with a 323 sq. ft. commercial yield.

Custom Contractor Logo Printing: Commercial general contractors can print their corporate logo and site safety notices directly onto AEROGUARD™ rolls at terminal-direct rates. Printed rolls work as site identification during client walkthroughs and superintendent inspections, carry safety messaging at floor level across the work area, and give building material dealers a ready-made private-label program. Logo printing is specified through the HS Sotra Global Trade Desk alongside the pallet order.

Calculate how many floor protection rolls you need

Use this basic calculation:

Required rolls = floor area ÷ 323 sq. ft. per roll, rounded up

For a 10,000 sq. ft. floor:

10,000 ÷ 323 = 30.96, so plan for 31 rolls before an allowance.

That is the theoretical minimum based on the stated commercial yield. Real layouts require cuts around columns, doorways and room shapes, and may need overlaps. As a planning example, add 5–10% for waste and overlap:

  • 5% allowance: 10,500 ÷ 323 = 32.51 → 33 rolls
  • 10% allowance: 11,000 ÷ 323 = 34.06 → 35 rolls

Use the higher allowance when the floor plan has many obstructions or the installation requires more trimming. Confirm the site’s measured coverage and installation approach before ordering.

Contractor unrolling floor protection across a commercial interior while planning site coverage

Floor protection specification checklist

Include these points in the project specification or procurement request:

  1. Identify the substrate and finish. Note whether the floor is hardwood, LVP, tile, concrete or another surface.
  2. Confirm readiness. Check that the surface is clean, dry and ready to cover, and verify cure requirements with the flooring manufacturer.
  3. Describe site conditions. State expected traffic, trade sequence, spill exposure and protection duration.
  4. Name the system and its requirements. For AEROGUARD™, specify the waterproof PE top layer, anti-slip fleece, zero perimeter taping required and 90-day residue-free clean release.
  5. Set coverage and ordering quantities. Calculate net area, then add a project-specific allowance for cuts and overlap.
  6. Plan inspection and removal. Assign responsibility for checking the floor covering and removing it when protection is no longer needed.

For contractors and dealers in Metro Vancouver and the Pacific Northwest, AEROGUARD™ is staged and dispatched from HS Sotra Global’s Distribution Hub in Annacis Island, Delta, BC Canada. The distribution operation offers same-day pickup staging and next-day job-site delivery across Metro Vancouver and the Pacific Northwest.

Palletized floor protection rolls staged at a warehouse dock for contractor distribution

Frequently asked questions

How much floor protection do I need?

Divide the measured floor area by the roll’s stated coverage, then round up to a whole roll. For AEROGUARD™, use 323 sq. ft. per 1 m × 30 m roll. Add an allowance for overlap, cuts and obstructions; a 5–10% planning allowance brings a 10,000 sq. ft. floor to approximately 33–35 rolls.

Does self-adhesive floor protection leave residue?

It depends on the product, surface and installation conditions. AEROGUARD™ is specified for a 90-day residue-free clean release. Still, confirm the substrate is suitable and follow installation guidance; where project requirements call for it, check a small area first and observe the applicable time limit.

Can floor protection be used over hardwood, LVP, tile or concrete?

The surface type alone is not enough to determine compatibility. Check the flooring manufacturer’s instructions and the protection product’s specifications, including any cure, moisture or attachment restrictions. Confirm the floor is ready to cover, prepare it as directed and test where appropriate before protecting the full area.

How long can floor protection stay down?

Use the product’s stated time limit and the flooring manufacturer’s guidance. AEROGUARD™ specifies a 90-day residue-free clean release; this is not a reason to leave it down without monitoring. Inspect the covering during the project and remove it when protection is no longer needed or if site conditions require earlier removal.

Request swatches or pallet pricing

Swatch Kits and direct wholesale pricing are reserved for commercial volume buyers: general contractors, estimators, and subtrades running volume tenders. The commercial baseline tier starts at approximately 100 rolls, so single-roll and retail orders are not the intended use of this program.

For free job-site Swatch Kits, commercial pallet pricing or an Annacis Island pickup booking, contact HS Sotra Global Ventures Inc. or call the HS Sotra Global Trade Desk at +1 (604) 362-0039. The Distribution Hub: Annacis Island, Delta, BC Canada handles staging and dispatch. Include the project location, floor area, surface type and anticipated delivery or pickup timing.